Solve the question of and select the option from the choices A through D/E. Check your Answer and view the explanation.
The pie-graph given below shows the breakup of the cost of construction of a house. Assuming that the total cost of construction is Rs 600000.
The sum spent on work surpasses the sum spent on steel by
Amount spent on labor=Rs. (90⁄360 × 600000) = Rs. 150000.
Sum spent on steel =Rs. ( 54⁄360 × × 600000) = Rs. 90000
Excess = Rs. (150000 - 90000 = Rs. 60000
Let 60000 = x% of 600000. At that point x⁄100 × 600000 = 60000.
x = 10% of aggregate expense.